Finally, after weeks of preparation, it's time to pour the concrete for the ramp area.

Pouring concrete starts at 4AM


Boom of the concrete pump

Boom pump reflects the bright construction site lights.



Once they start placing the concrete, it takes a stream of trucks to supply the pump.

Trucks line up to supply the concrete to the boom pump


 